Quick Facts
Location
Woodcliff Lakes, NJ
Client
Confidential large pharmaceutical
Project:
Large Pharmaceutical Facility
Binsky replaced a water-cooled chiller with an air-cooled chiller at a large pharmaceutical facility. To complete this project, the inside piping had to be completely reconfigured and reinsulated. Additionally, all pumps were replaced. Binsky removed the existing cooling tower and reconfigured the steel supports to accept the new air-cooled chiller and fencing around the new chiller. Attempting to meet project deadlines and coordinating subcontractor work during a pandemic presented a challenge for our team, however, all deadlines were met successfully.